PREVIOUS PROJECTS
|
|
2001 Collins Transport Australia
|
 |
|
Marwen Drive, Ardeer
Wash bays, petrol bowsers, offices, drivers sleeping quarters, 3000m2 coolrooms, 8000m2 warehouse, 8000m2 hardstand, loading bays and 8 dock levellers
|
|
|
|
HS Rekaris, Civil, Electrical, Structural
|
|
|
|
|
Builder: |
Costa Rico Constructions |
|
 |
|
2003, Church, Roman Catholic Archdiocese
of Melbourne
|

Reference
|
|
93-97 Somerset Road, Campbellfield
1200 seated parish church, including steeples, dome,
and mezzanine floors
|
|
|
|
HS Rekaris, Civil, Electrical, Structural, Mechanical
|
|
HS Rekaris |
|
HS Rekaris |
Project Manager: |
HS Rekaris |
Builder: |
Costa Rico Constructions |
|
 |
Project: |
2004, Unit development |
 |
Decription: |
19 Queens Avenue, Doncaster
5 Double Storey Georgian Style Unit development |
Cost: |
$1,400,000 |
Engineer: |
HS Rekaris, Civil, Electrical, Structural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2001, Ardeers Home Maker Centre |
 |
Decription: |
Lots 4-10 Overland Drive, Narre Warren
1000m2 showroom, RC Panels, portal frame and associated carpark |
Cost: |
$800,000 |
Engineer: |
HS Rekaris, Civil, Structural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
|
2005, Workplace Standards Tasmania
|
|
|
30 Gordans Hill Road, Rosney Park, Tasmania
Extension and fit-out of Government Building, including
two additional modules, to the government building and associated car parking
|
|
|
|
HS Rekaris, Civil, Structural
|
|
HS Rekaris |
|
HS Rekaris |
Project Manager: |
HS Rekaris |
|
 |
|
2000, Bunker Freight Lines Australia
|
|
|
Lot 9 Fulton Drive, Ardeer
Workshops, wash bays, service pits, re-circulated storm water system, floor drains, petrol bowsers, offices and drivers sleeping quarters
|
|
|
|
HS Rekaris, Civil, Structural, Mechanical
|
|
HS Rekaris |
|
HS Rekaris |
Project Manager: |
HS Rekaris |
|
 |
Project: |
2005 Broiler Farm |
|
Decription: |
Lot 4 Bulban Road, Whyndham
16 Broiler sheds, totalling approximately 4 hectares in size Unique design of broiler farm sheds leading to write up in the CSIRO magazine ECOS, for sustainable environment. |
Cost: |
$10,000,000 |
Engineer: |
HS Rekaris, Civil, Structural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
|
 |
|
2006 SAJ Fruit Supplies & Cater Care
|
|
|
Maygar Boulevard Broadmeadows
1600m2 warehouse, food preparation area, 600m2 coolrooms, offices and hard stand area
|
|
|
|
HS Rekaris, Civil, Electrical, Structural, Mechanical
|
|
HS Rekaris |
| |
HS Rekaris |
|
 |
Project: |
2006, Unit development |
 |
Decription: |
Mayfair Avenue Templestowe |
Cost: |
$850,000 |
Engineer: |
HS Rekaris, Civil, Electrical, Structural |
Designer: |
HS Rekaris |
Town Plannere: |
HS Rekaris |
|
 |
Project: |
2007, Hydralight Pharmaceuticals |
 |
Decription: |
Lot 37 Wurundjeri Dve, Epping
Manufacturing and warehouse building, 2,500m2 and associated car parking.
RC panels, slab on ground, problematic soil condition |
Cost: |
$1,800,000 |
Engineer: |
HS Rekaris, Civil, Structural, Electrical, Mechanical |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2008, Manningham Medical Centre |
 |
Decription: |
200 High St Lower Templestowe
Level 6 extension to the existing medical centre
A 155m2 extension of the 6th floor over the existing patio area, using a light weight steel frame attached to the existing roof, and incorporating the existing awning design to the new extension. |
Cost: |
$550,000 |
Engineer: |
HS Rekaris, Structural, Electrical |
Designer: |
HS Rekaris |
|
 |
Project: |
2008, N.I.G.S (Nose-in Guidance System)
mounting poles |
 |
Decription: |
Melbourne Airport
Design of NIGS poles mounted from existing aerobridges for two plane approach paths at Melbourne’Äôs Tullamarine Airport |
Engineer: |
HS Rekaris, Structural |
Designer:
|
HS Rekaris
|
|
 |
Project: |
2007, Unit development |
 |
Decription: |
37 Lemon Grove, Nunawading
Three unit development, 450m2 |
Cost: |
$620,000 |
Engineer: |
HS Rekaris, Civil, Stryctural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2008, Shop-top dwelling and rear apartment |
 |
Decription: |
85 Union St Brunswick
Shop and caretakers dwelling facing Union Street with
rear two storey three bedroom unit |
Cost: |
$600,000 |
Engineer: |
HS Rekaris, Civil, Structural, Electrical |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2008, Transport marshalling yard |
 |
Decription: |
Narromine Road Dubbo NSW
Hardstand and civil works, offices, truck wash and
drivers sleeping quarters |
Cost: |
$3,000,000 |
Engineer: |
HS Rekaris, Civil |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2009, First floor extension to existing dwelling |
 |
Decription: |
26 Eliza Street Black Rock
First floor Extension to existing dwelling |
Cost: |
$350,000 |
Engineer: |
HS Rekaris, Civil, Electrical, Structural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
 |
Project: |
2009, First floor extension to existing dwelling |
 |
Decription: |
Wales St Kingsville
First floor and rear extension to heritage listed dwelling |
Cost: |
$350,000 |
Engineer: |
HS Rekaris, Civil, Electrical, Structural |
Designer: |
HS Rekaris |
Town Planner: |
HS Rekaris |
|
|
 |